Intel announces cancellation of 20A process node for Arrow Lake, goes with external nodes instead, likely TSMC
Intel announces cancellation of 20A process node for Arrow Lake, goes with external nodes instead, likely TSMC
www.tomshardware.com Intel announces cancellation of 20A process node for Arrow Lake, goes with external nodes instead, likely TSMC
Out with the Intel node, in with TSMC.
7
comments
The article says they're instead putting their resources into manufacturing the 18A node process to save costs. Doesn't sound like TSMC is a permanent solution.
13ReplyNo, TSMC is not supposed to be a permanent solution. Just Arrow Lake.
5Reply
So long, Intel.
9ReplyThat would not be a good thing. The CPU/GPU design and semiconductor fab industries are already massively concentrated.
26ReplyAgreed, It wouldn't be a good thing. However it's their own failures and mismanagement that are causing it.
17Reply